top of page
Shop refurbishment - Phase 3

Once the points and outlets have been marked out and holes drilled, we feed the cables through the cavities behind your walls, floors and ceilings. 

 

It is usual practice to allow trades operatives to carry out work, such as plastering, carpentry and glazing; after which we return to test the integrity of cabling, ensure fittings can be correctly and safely fitted to the visible wiring. 

 

Above are some examples of the exposed cabling protruding from the finished plasterwork. We also take this opportunity to reinspect any surface cabling, which we normally place in a protective casing that accommodates multiple runs of cable. 

 

 

 

bottom of page